Report on the Study of Environmental Impact Assessment

  1. GENERAL DATAS 1.1. Name the investment objective 1.2. Target location and address 1.3. Legal regime 1.4. Existing situation 1.5. Documentary sources 1.6. General designer 1.7. Owner and beneficiary of the investment 2. DESCRIPTION OF THE WORKS DESIGNED 2.1. Purpose and need 2.2. Project description 2.3. Utilities 3. Data on site – LOCATION IN … Read more

Shadow Study

  The shading study is necessary to obtain complete documentation for obtaining the Favorable Approval for an Urban Area Plan and to obtain the Building Authorization.   This can be used as evidence in court if litigation.   As specific elements underlying the calculation of a building shadow, we present the following specifications: – To … Read more

Appropriate Environmental Assessment Study

  1. Introduction, 2. Steps of the proper assessment procedure, 2.1. Framing stage, 2.2. Proper assessment study stage, 2.3. Alternative solutions stage, 2.4. Compensatory measurements stage, when there are no alternative solutions and when negative impact persists 3. Conclusions.            The Design Office is working with specialists with the right for … Read more

Environmental Report required for Zoning Plan Approval

– specify the current state of environmental factors in the target area; – determine the sources and causes that can generate, at a time, a certain level of emissions of pollutants discharged into the environment and other effects with negative impact on the environment caused by the execution or exploitation of the objective; – Establish … Read more

Report on further environmental impact assessment after completion of the construction

1. Introduction 2. Details of the Project activity 3. Geographical and physical conditions – Geographical place – “Geonomy”, physical and geographical structure – Climate – Hydrographic network 4. Monitoring bird populations – Species – Areas – Important Bird Areas – Ecosystems 5. Quantitative research methods of bird populations 6. Materials and methods 7. Location 8. … Read more

Report on further environmental impact assessment, Phase of works C + M *

Beneficiaries Designer Regulatory acts Description of the current situation on the ground Stages of the project Work done, components features Description of technical arrangements Information about physical pollutants Waste management 2. Potential impact on environmental components 2.1. Water 2.1.1. Water supply 2.1.2. Wastewater management 2.1.3. Sources of water pollution and pollutants generated 2.1.4. Hydrogeological considerations … Read more

Presentation sheet and statement required to obtain environmental permits

General information: – Location – Activity profile – Ownership – Conditions of work (hours / day, days / week, days / year)   Specific activity data: – Work – Facilities Material balance Utilities – Sources of pollution and protection of environmental factors – Sources of noise and vibration – Facilities, arrangements and measures for protection … Read more

Environmental Studies

*  Report on further environmental impact assessment, Phase of works C + M *   *  Report on further environmental impact assessment after completion of the construction   *  Environmental Report required for Zoning Plan approval   *  Appropriate Environmental Assessment Study   *  Study Report on Environmental Impact Assessment   *  Noise Study   *  … Read more