Specializes Studies – Blog
Studies in Renewable Energy Potential – Interactiv Map
5 reasons why you can become an Add-Energy Renewable Romania PARTNER To register your Company as ADD ENERGY PARTNER , please access For other informations click to
Zonal Urban Plans
The develop of a quality P.U.Z. requires (excerpt from Guide to methodology development and content framework of the Urban Zoning Plan): – Entrusting the work to a design unit with experts in the field; – Correlation of the regulations with the results of the General Urban Plan and the conclusions of the specialized studies; … Read more
The determination in WGS-84 geodetic system of the coordinates and their integration into the map of airports obstacles
The study that we can draw shall contain the following information: – Name of the work – Beneficiary of the work – The work contractor – The scope of work – Operations performed – Establishing WGS-84control – Description of equipment, procedures and software used – Equipment – Procedures – Software – GPS observational conditions … Read more
Technical documentation for the ANIF RA agreement for the investment objective
WRITTEN PARTS – Technical Memorandum – General Information Name of the investment objective: – Necessity and opportunity of investment, – The intersection of electric cables with land improvement works, – Technical conditions for carrying out the wire intersection with land improvement works, – The works on achieving LES intersection with land improvement … Read more
Specialized Add Energy Studies
1 NOISE STUDY 2 GEOTECHNICAL STUDY 3 ACQUIRE A MEASURING CLIMATE CONDITIONS POLE 4 WIND STUDY IN ROMANIA 5 Studiu de Solutie necesar obtinerii AVIZULUI TEHNIC DE RACORDARE 6 Studiul de Insorire ( Umbra ) 7 Study Report on Environmental Impact Assessment 8 Appropriate Environmental Assessment Study 9 G.I.S. ( Geographic Information System ) 10 … Read more
G.I.S. ( Geographic Information System )
We offer services in the field of geographic information systems to the highest standards of quality and efficiency. It is important to mention that we offer both GIS solutions on standard platforms, but also according to customer request, so that he can use as its goals. – Collecting spatial data: scanning, … Read more
Report on the Study of Environmental Impact Assessment
1. GENERAL DATAS 1.1. Name the investment objective 1.2. Target location and address 1.3. Legal regime 1.4. Existing situation 1.5. Documentary sources 1.6. General designer 1.7. Owner and beneficiary of the investment 2. DESCRIPTION OF THE WORKS DESIGNED 2.1. Purpose and need 2.2. Project description 2.3. Utilities 3. Data on site – LOCATION IN … Read more
Shadow Study
The shading study is necessary to obtain complete documentation for obtaining the Favorable Approval for an Urban Area Plan and to obtain the Building Authorization. This can be used as evidence in court if litigation. As specific elements underlying the calculation of a building shadow, we present the following specifications: – To … Read more
Appropriate Environmental Assessment Study
1. Introduction, 2. Steps of the proper assessment procedure, 2.1. Framing stage, 2.2. Proper assessment study stage, 2.3. Alternative solutions stage, 2.4. Compensatory measurements stage, when there are no alternative solutions and when negative impact persists 3. Conclusions. The Design Office is working with specialists with the right for … Read more
Environmental Report required for Zoning Plan Approval
– specify the current state of environmental factors in the target area; – determine the sources and causes that can generate, at a time, a certain level of emissions of pollutants discharged into the environment and other effects with negative impact on the environment caused by the execution or exploitation of the objective; – Establish … Read more
Report on further environmental impact assessment after completion of the construction
1. Introduction 2. Details of the Project activity 3. Geographical and physical conditions – Geographical place – “Geonomy”, physical and geographical structure – Climate – Hydrographic network 4. Monitoring bird populations – Species – Areas – Important Bird Areas – Ecosystems 5. Quantitative research methods of bird populations 6. Materials and methods 7. Location 8. … Read more
Report on further environmental impact assessment, Phase of works C + M *
Beneficiaries Designer Regulatory acts Description of the current situation on the ground Stages of the project Work done, components features Description of technical arrangements Information about physical pollutants Waste management 2. Potential impact on environmental components 2.1. Water 2.1.1. Water supply 2.1.2. Wastewater management 2.1.3. Sources of water pollution and pollutants generated 2.1.4. Hydrogeological considerations … Read more
Presentation sheet and statement required to obtain environmental permits
General information: – Location – Activity profile – Ownership – Conditions of work (hours / day, days / week, days / year) Specific activity data: – Work – Facilities Material balance Utilities – Sources of pollution and protection of environmental factors – Sources of noise and vibration – Facilities, arrangements and measures for protection … Read more
Electrical Study for connecting users to public electricity networks
We offer Solutions for Connecting facilities of a user to the public electricity network through the preparation of the solution sheet or the solution study. Devising of the solution sheet According to the Regulation, the connection solution is established through the solution sheet for: 1) individual household type users, regardless of the … Read more
Geotechnical Study
We perform geotechnical studies in the laboratory phase – Analysis of water found in drilling; – Characteristics of the contract; – Limits of flow, of kneading, plastic index and consistency index of plasticity; – Compressibility module, … Read more
Noise Study
Based on the inventory of sources of industry, provided by the customer and field visits to perform measurements and observations on existing equipment and facilities, some of which are sources of noise, there was a brief characterization of them in terms of acoustic. Since on the site studied are installations that can encapsulate … Read more
Environmental Studies
* Report on further environmental impact assessment, Phase of works C + M * * Report on further environmental impact assessment after completion of the construction * Environmental Report required for Zoning Plan approval * Appropriate Environmental Assessment Study * Study Report on Environmental Impact Assessment * Noise Study * … Read more
Wind Study in Romania
For this kind of wind the frequency is much higher during the winter, with NE-SW direction, blowing at speeds sometimes exceeding 30-35 m / sec and causing the most powerful storms in our country. In the warm period of the year, although its frequency is much lower, the “chill wind “ is a damaging … Read more
Purchase a Measuring pole for Climatie Conditions
This data gives us a good perspective of wind potential, if we focus for longer periods of time. Professional measurements are carried by wind developers of wind farms in different locations – around 70 such locations a few years ago, now more, most of them located in Dobrogea and Moldavia region, demonstrating interest … Read more
Top Searched Add Energy Services
2. Specialised Studies – Consulting and managing 3. Architecture 4. Technical land Measurements 5. Technical design 6. Environmental Studies 7. Construction – Consulting and Execution 8. Electrical instalations – Consulting and Execution 5 reasons why you can become an Add-Energy Renewable Romania PARTNER To register your Company as ADD ENERGY PARTNER , please … Read more
Technical documentation for the ANIF RA agreement for the investment objective
WRITTEN PARTS – Technical Memorandum – General Information Name of the investment objective: – Necessity and opportunity of investment, – The intersection of electric cables with land improvement works, – Technical conditions for carrying out the wire intersection with land improvement works, – The works on achieving LES intersection with land improvement works, – … Read more