{"id":15034,"date":"2014-06-24T17:32:17","date_gmt":"2014-06-24T14:32:17","guid":{"rendered":"https:\/\/add-energy.ro\/cernavoda-npp-will-go-through-the-procedure-of-environmental-impact-assessment\/"},"modified":"2014-06-24T17:32:17","modified_gmt":"2014-06-24T14:32:17","slug":"cernavoda-npp-will-go-through-the-procedure-of-environmental-impact-assessment","status":"publish","type":"post","link":"https:\/\/add-energy.ro\/en\/cernavoda-npp-will-go-through-the-procedure-of-environmental-impact-assessment\/","title":{"rendered":"Cernavoda NPP will go through the procedure of environmental impact assessment"},"content":{"rendered":"<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span lang=\"en\"><span title=\"M\u0103sura vizeaz\u0103 toate centralele nucleare din Europa ce \u00ee\u0219i dep\u0103\u0219esc durata de via\u021b\u0103 \u0219i va fi aplicat\u0103 \u00eenainte de re\u00eennoirea licen\u021belor.\">The measure covers all nuclear power plants in Europe that exceed their lifetime and will be applied before renewing licenses. <\/span><span title=\"Decizia vine pe fondul extinderii duratei de via\u021b\u0103 a reactoarelor nucleare 1 \u0219i 2 ale centralei de la Rivne, Ucraina.\">The decision comes amid extending the life of nuclear reactors 1 and 2 of the plant in Rivne, Ukraine.<\/span><\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span lang=\"en\"><span title=\"\u00cennoirea licen\u021belor permite centralelor nucleare s\u0103 \u00ee\u0219i extind\u0103 durata de via\u021b\u0103 de 30 de ani cu \u00eenc\u0103 10 ani. &nbsp;&nbsp;&nbsp;&nbsp;\">Renewal of licenses allow nuclear plants to extend the life of 30 years for another 10 years.<\/span><\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<blockquote>\n<p style=\"text-align: justify;\">\n\t\t<span lang=\"en\"><span title=\"Impactul asupra mediului este doar unul dintre aspectele care fac ca energia nuclear\u0103 s\u0103 nu reprezinte o solu\u021bie energetic\u0103 sustenabil\u0103.\">Environmental impact is one of the aspects that make nuclear power does not represent a sustainable energy solution. <\/span><span title=\"Pe de alt\u0103 parte, costurile ascunse ale dezafect\u0103rii reactoarelor \u0219i ale depozit\u0103rii de\u0219eurilor sunt uria\u0219e.\">On the other hand, the hidden costs of decommissioning reactors and waste disposal are huge. <\/span><span title=\"\u00cenainte de a ne g\u00e2ndi la prelungirea duratei de via\u021b\u0103 a reactoarelor existente \u0219i la construirea unora noi, ar trebui luate \u00een calcul solu\u021bii cu adev\u0103rat sustenabile, precum eficien\u021ba energetic\u0103 \u0219i energia din surse regenerabile\u201d, a spus Lavinia Andrei, pre\u0219edintele Funda\u021biei TERRA Mileniul III. \">Before we think of extending the life of existing reactors and build new ones, should be considered truly sustainable solutions, such as energy efficiency and renewable energy, &quot;said Lavinia Andrei, president of the Foundation TERRA millennium.<\/span><\/span>\n\t<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">\n<p>\t<span lang=\"en\"><span title=\"Unitatea 1 a Centralei nucleare de la Cernavod\u0103 a intrat \u00een exploatare \u00een anul 1996 \u0219i va mai func\u021biona cu actuala licen\u021b\u0103 cel mult p\u00e2n\u0103 \u00een anul 2026. \u00cen contextul \u00een care tot mai multe state europene inten\u021bioneaz\u0103 s\u0103 renun\u021be la centralele nucleare, Rom\u00e2nia caut\u0103 investitori pentru unit\u0103\u021bile\">Unit 1 of the Cernavoda nuclear power plant went into operation in 1996 and will operate with maximum current license until 2026. Given that more and more European countries plans to abandon nuclear power, Romania seeks investors for units <\/span><span title=\"3 \u0219i 4 de la Cernavod\u0103 \u0219i pentru un nou depozit de de\u0219euri radioactive, ce urmeaz\u0103 s\u0103 fie construit la Saligny, cu o investi\u021bie total\u0103 de peste 400 de milioane de euro. \">3 and 4 of the Cernavoda and a new deposit of radioactive waste to be built at Saligny, with a total investment of over 400 million.<\/span><\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p>\n\t<span lang=\"en\"><span title=\"\u00cen urma deciziei Comitetului de implementare a Conven\u021biei de la Espoo, 60 de reactoare nucleare ce \u0219i-au dep\u0103\u0219it durata de via\u021b\u0103 din Europa vor trebui s\u0103 fie supuse evalu\u0103rii de mediu, \u00een urm\u0103torii trei ani. \">Following the decision of the Implementation Committee of the Espoo Convention, 60 nuclear reactors that have exceeded their life in Europe will be subject to environmental assessment in the next three years.<\/span><\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p>\n\t<span lang=\"en\"><span title=\"Potrivit Greenpeace, reactoarele CANDU de la Cernavod\u0103 sunt proiectate pentru o durat\u0103 de via\u021b\u0103 de 25 de ani, iar acest lucru \u00eenseamn\u0103 c\u0103 \u00een opt ani, reactorul 1 de la Cernavod\u0103 ar trebui deja \u00eenchis. &nbsp;&nbsp;&nbsp;&nbsp;\">According to Greenpeace, the Cernavoda CANDU reactors are designed for a lifetime of 25 years, and this means that in eight years, one of the Cernavoda reactor should already closed.<\/span><\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<blockquote>\n<p style=\"text-align: justify;\">\n\t\t<span lang=\"en\"><span title=\"Potrivit Greenpeace, reactoarele CANDU de la Cernavod\u0103 sunt proiectate pentru o durat\u0103 de via\u021b\u0103 de 25 de ani, iar acest lucru \u00eenseamn\u0103 c\u0103 \u00een opt ani, reactorul 1 de la Cernavod\u0103 ar trebui deja \u00eenchis. &nbsp;&nbsp;&nbsp;&nbsp;\">&nbsp;<\/span><span title=\"Av\u00e2nd \u00een vedere c\u0103 mare parte din reactoarele nucleare construite p\u00e2n\u0103 acum se apropie de finalul duratei de func\u021bionare pentru care au fost proiectate, iar o parte dintre acestea au dep\u0103\u0219it chiar aceast\u0103 perioad\u0103, iar prelungindu-\u0219i durata de func\u021bionare a necesitat aducerea de \u00eembun\u0103t\u0103\u021biri semnificative reactoarelor\">In view of that most of the reactors are built before reaching the end of its life for which they were designed, and some of them are even exceeded the time, and also extends the life of the reactor required to bring significant improvements <\/span><span title=\", statul rom\u00e2n ar trebui sa aib\u0103 \u00een vedere faptul c\u0103 \u0219i reactorul 1 de la Cernavod\u0103 \u00ee\u0219i va finaliza ciclul de via\u021b\u0103 \u00een nu mai mult de 8 ani de acum.\">Romanian state should consider the fact that one reactor at Cernavoda will complete its life cycle in no more than 8 years now. <\/span><span title=\"Datorit\u0103 costurilor extrem de mari pe care le presupune dezafectarea unui reactor nuclear, ar trebui g\u00e2ndit \u00een perspectiv\u0103 \u0219i inclus acest proiect \u00een strategia energetic\u0103.\">Due to the extremely high costs involved in decommissioning a nuclear reactor should be thinking ahead and included this project in the energy strategy. <\/span><span title=\"Acest lucru ar trebui luat \u00een considerare, cu at\u00e2t mai mult cu c\u00e2t prelungirea duratei de func\u021bionare a reactoarelor CANDU presupune ni\u0219te costuri \u0219i mai mari, f\u0103c\u00e2nd aceast\u0103 opera\u021biune nerentabil\u0103 din punct de vedere economic\u201d, spune Alexandru Riza, coordonator de campanii Greenpeace Rom\u00e2nia.\">This should be taken into account, more so as to extend the operation of CANDU reactors involves some cost and higher, making the operation of economically unprofitable, &quot;says Alexandru Riza, coordinator of Greenpeace campaigns Romania.<\/span><\/span>\n\t<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"margin-left: 40px; text-align: center;\">\n\t<span lang=\"en\"><span span=\"\" title=\"\"><span lang=\"en\"><span span=\"\" title=\"\"><span class=\"microcontent\" data-description=\"when your employees feel that they can tangibly impact the direction of the company, they're more likely to throw themselves fully behind the cause.\" data-fragment=\"when-your-employees-feel\" data-micro=\"1\" span=\"\"><span for=\"\" required=\"\" span=\"\" title=\"\u00cen schimb, potrivit proiectului, articolul 17 se modific\u0103 astfel:\"><span span=\"\" title=\"plastic \u015fi sticl\u0103\"><span style=\"font-size:14px;\"><span style=\"font-family: tahoma,geneva,sans-serif;\"><a href=\"http:\/\/add-energy.ro\/en\/5-motive-pentru-care-puteti-deveni-partener-add-energy\/\" target=\"_blank\" rel=\"noopener\">5 reasons why you can become an Add-Energy Renewable Romania PARTNER<\/a><\/span><\/span> <\/span><\/span> <\/span> <\/span><\/span><\/span><\/span>\n<\/p>\n<p style=\"margin-left: 40px;\">\n\tTo register your Company as ADD ENERGY PARTNER , please access<span lang=\"en\"><span span=\"\" title=\"\"><span lang=\"en\"><span span=\"\" title=\"\"><span class=\"microcontent\" data-description=\"when your employees feel that they can tangibly impact the direction of the company, they're more likely to throw themselves fully behind the cause.\" data-fragment=\"when-your-employees-feel\" data-micro=\"1\" span=\"\"><span for=\"\" required=\"\" span=\"\" title=\"\u00cen schimb, potrivit proiectului, articolul 17 se modific\u0103 astfel:\"><span span=\"\" title=\"plastic \u015fi sticl\u0103\"><span style=\"font-size:14px;\"><span style=\"font-family: tahoma,geneva,sans-serif;\"> &nbsp; <a href=\"http:\/\/add-energy.ro\/wp-login.php?action=register\"><img loading=\"lazy\" decoding=\"async\" alt=\"register_now_2\" height=\"44\" src=\"http:\/\/add-energy.ro\/wp-content\/uploads\/2013\/05\/register_now_2.png\" width=\"94\" \/><\/a><\/span><\/span> <\/span><\/span> <\/span> <\/span><\/span><\/span><\/span>\n<\/p>\n<p style=\"margin-left: 40px;\">\n\tFor other informations click to <span style=\"font-family:tahoma,geneva,sans-serif;\"><a href=\"http:\/\/add-energy.ro\/companie\/contact\/\"><img loading=\"lazy\" decoding=\"async\" alt=\"Contact-Us\" height=\"64\" src=\"http:\/\/add-energy.ro\/wp-content\/uploads\/2013\/05\/Contact-Us.jpg\" width=\"98\" \/><\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; The measure covers all nuclear power plants in Europe that exceed their lifetime and will be applied before renewing licenses. The decision comes amid extending the life of nuclear reactors 1 and 2 of the plant in Rivne, Ukraine. &nbsp; Renewal of licenses allow nuclear plants to extend the life of 30 years for &#8230; <a title=\"Cernavoda NPP will go through the procedure of environmental impact assessment\" class=\"read-more\" href=\"https:\/\/add-energy.ro\/en\/cernavoda-npp-will-go-through-the-procedure-of-environmental-impact-assessment\/\" aria-label=\"Read more about Cernavoda NPP will go through the procedure of environmental impact assessment\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[277,45,374,32,251,250,80,31],"tags":[],"class_list":["post-15034","post","type-post","status-publish","format-standard","hentry","category-answers-to-your-requests","category-clima-si-mediul-inconjurator","category-climate-and-the-environment-3","category-informatii-din-presa-nationala","category-local-press-release","category-news","category-raspunsuri-la-solicitarile-dumneavoastra","category-stiri-utile-noutati"],"_links":{"self":[{"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/posts\/15034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/comments?post=15034"}],"version-history":[{"count":0,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/posts\/15034\/revisions"}],"wp:attachment":[{"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/media?parent=15034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/categories?post=15034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/tags?post=15034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}