{"id":15008,"date":"2014-06-18T23:09:07","date_gmt":"2014-06-18T20:09:07","guid":{"rendered":"https:\/\/add-energy.ro\/paradise-wind-farm-in-dobrogea-romania-on-the-verge-of-collapse\/"},"modified":"2014-06-18T23:09:07","modified_gmt":"2014-06-18T20:09:07","slug":"paradise-wind-farm-in-dobrogea-romania-on-the-verge-of-collapse","status":"publish","type":"post","link":"https:\/\/add-energy.ro\/en\/paradise-wind-farm-in-dobrogea-romania-on-the-verge-of-collapse\/","title":{"rendered":"Paradise wind farm in Dobrogea \/ Romania, on the verge of collapse"},"content":{"rendered":"<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span lang=\"en\"><span class=\"hps\">&quot;It&#39;s very<\/span> <span class=\"hps\">difficult to<\/span> <span class=\"hps\">evacuate<\/span> <span class=\"hps\">electrical power<\/span> <span class=\"hps\">that<\/span> <span class=\"hps\">wind turbines<\/span> <span class=\"hps\">could<\/span> <span class=\"hps\">produce.<\/span> <span class=\"hps\">Should be<\/span> <span class=\"hps\">massive investment in<\/span> <span class=\"hps\">electricity transmission<\/span> <span class=\"hps\">infrastructure<\/span><span>, &quot;said<\/span> <span class=\"hps\">Gabriel<\/span><span>, PhD<\/span> <span class=\"hps\">Negreanu,<\/span> <span class=\"hps\">Bucharest Polytechnic University<\/span> <span class=\"hps\">representative<\/span> <span class=\"hps\">at the International Conference<\/span> <span class=\"hps\">of<\/span> <span class=\"hps\">Thermal<\/span> <span class=\"hps\">Equipment<\/span><span>, held<\/span> <span class=\"hps\">on the coast.<\/span><\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">He explained that<\/span> <span class=\"hps\">already<\/span> <span class=\"hps\">is reached the maximum<\/span> <span class=\"hps\">power<\/span> <span class=\"hps\">that can be taken<\/span> <span class=\"hps\">in<\/span> <span class=\"hps\">Dobrogea<\/span> <span class=\"hps\">by the<\/span> <span class=\"hps\">National Power System<\/span><span>.<\/span> <span class=\"hps atn\">&quot;<\/span><span>Experts say that<\/span> <span class=\"hps\">the<\/span> <span class=\"hps\">total<\/span> <span class=\"hps\">would be about<\/span> <span class=\"hps\">3,000<\/span> <span class=\"hps\">megawatts<\/span> <span class=\"hps\">that the system<\/span> <span class=\"hps\">could<\/span> <span class=\"hps\">run<\/span>. <span class=\"hps\">At the moment<\/span> <span class=\"hps\">we have over<\/span> <span class=\"hps\">3,000<\/span> <span class=\"hps\">megawatts<\/span> <span class=\"hps\">of wind energy<\/span> <span class=\"hps\">and<\/span> <span class=\"hps\">photovoltaics<\/span><span>, &quot;said<\/span> <span class=\"hps\">Gabriel<\/span><span>, PhD<\/span> <span class=\"hps\">Negreanu.<\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">The situation is even<\/span> <span class=\"hps\">more serious<\/span> <span class=\"hps\">in the near future<\/span> <span class=\"hps\">it sees<\/span> <span class=\"hps\">no<\/span> <span class=\"hps\">solution to the<\/span> <span class=\"hps\">problems<\/span> <span class=\"hps\">and<\/span> <span class=\"hps\">the Cernavoda<\/span> <span class=\"hps\">nuclear plant<\/span> <span class=\"hps\">further complicate<\/span> <span class=\"hps\">things<\/span><span>.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t<span class=\"hps atn\">&quot;<\/span><span>We have too<\/span> <span class=\"hps\">much electricity<\/span><span>.<\/span> <span class=\"hps\">What about<\/span> <span class=\"hps\">it?<\/span> <span class=\"hps atn\">&quot;<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">One<\/span> <span class=\"hps\">could<\/span> <span class=\"hps\">solve<\/span> <span class=\"hps\">the<\/span> <span class=\"hps\">Dobrogea<\/span> <span class=\"hps\">wind turbines<\/span><span>,<\/span> <span class=\"hps\">but for now<\/span> <span class=\"hps\">we can<\/span> <span class=\"hps\">only talk<\/span> <span class=\"hps\">about a project<\/span> <span class=\"hps\">on paper.<\/span> <span class=\"hps atn\">&quot;<\/span><span>We need a<\/span> <span class=\"hps\">submarine<\/span> <span class=\"hps\">cable<\/span><span>.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">They need<\/span> <span class=\"hps\">energy<\/span><span>, we can<\/span> <span class=\"hps\">export it<\/span><span>.<\/span> <span class=\"hps\">If<\/span> <span class=\"hps\">the wind blows<\/span> <span class=\"hps\">and the two<\/span> <span class=\"hps\">reactors<\/span> are <span class=\"hps\">working<\/span><span>,<\/span> we <span class=\"hps\">have<\/span> <span class=\"hps\">too much<\/span> <span class=\"hps\">power<\/span> <span class=\"hps\">and<\/span> <span class=\"hps\">nothing to do<\/span> <span class=\"hps\">with it<\/span><span>.<\/span> <span class=\"hps\">You can not stop<\/span> <span class=\"hps\">a<\/span> <span class=\"hps\">nuclear plant<\/span> <span class=\"hps\">just<\/span> <span class=\"hps\">a<\/span> <span class=\"hps\">few minutes<\/span> <span class=\"hps\">to stop<\/span> <span class=\"hps\">and<\/span> <span class=\"hps\">let her go<\/span><span>.<\/span> <span class=\"hps\">We seek<\/span> <span class=\"hps\">investors for<\/span> <span class=\"hps\">Units 3<\/span> <span class=\"hps\">and 4.<\/span> <span class=\"hps\">Are we sure<\/span> <span class=\"hps\">we want<\/span> <span class=\"hps\">this?<\/span> <span class=\"hps\">&quot;Said<\/span> <span class=\"hps\">Ion<\/span> <span class=\"hps\">D\u0103nu\u0163<\/span> <span class=\"hps\">Juganaru<\/span><span>, general manager of<\/span> <span class=\"hps\">Constanta<\/span> <span class=\"hps\">Chamber of Commerce<\/span><span>.&quot;<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">In fact<\/span><span>,<\/span> <span class=\"hps\">every winter<\/span> <span class=\"hps\">from 2011<\/span> <span class=\"hps\">onwards<\/span><span>, the wind farms<\/span> <span class=\"hps\">are forced to<\/span> <span class=\"hps\">periodically<\/span> <span class=\"hps\">stop<\/span> <span class=\"hps\">the turbines<\/span><span>, according to a<\/span> <span class=\"hps\">protocol<\/span> <span class=\"hps\">Transelectrica<\/span><span>,<\/span> <span class=\"hps\">whenever so required by<\/span> <span class=\"hps\">production<\/span> <span class=\"hps\">becomes too high.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">And<\/span> <span class=\"hps\">as<\/span> <span class=\"hps\">in the days<\/span> <span class=\"hps\">of<\/span> <span class=\"hps\">blizzard<\/span><span>,<\/span> <span class=\"hps\">wind turbines<\/span> <span class=\"hps\">production<\/span> <span class=\"hps\">exceeds<\/span> <span class=\"hps\">1,400<\/span> <span class=\"hps\">megawatts<\/span><span>,<\/span> <span class=\"hps\">which is exactly<\/span> <span class=\"hps\">the amount of energy<\/span> <span class=\"hps\">that comes from<\/span> <span class=\"hps\">the<\/span> <span class=\"hps\">nominal<\/span> <span class=\"hps\">two nuclear reactors<\/span><span>,<\/span> <span class=\"hps\">the system faces<\/span> <span class=\"hps\">a serious problem.<\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">Transelectrica<\/span> <span class=\"hps\">state company<\/span> <span class=\"hps\">says it has no<\/span> <span class=\"hps\">money for<\/span> <span class=\"hps\">modernization of<\/span> <span class=\"hps\">coastal<\/span> <span class=\"hps\">and<\/span> <span class=\"hps\">submarine<\/span> <span class=\"hps\">cable project<\/span> <span class=\"hps\">to Turkey<\/span><span class=\"hps\">, as<\/span> <span class=\"hps\">mentioned<\/span> <span class=\"hps\">above, only<\/span> <span class=\"hps\">the stage of<\/span> <span class=\"hps\">drawing<\/span><span>.<\/span> <span class=\"hps\">The surplus<\/span> <span class=\"hps\">energy<\/span> <span class=\"hps\">seems<\/span> <span class=\"hps\">unsolvable<\/span><span>.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<strong><span class=\"hps\">Two<\/span> <span class=\"hps\">fouls<\/span> <span class=\"hps\">red<\/span><\/strong>\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">Although<\/span> <span class=\"hps\">no<\/span> <span class=\"hps\">government official<\/span> <span class=\"hps\">will not<\/span> <span class=\"hps\">recognize<\/span> <span class=\"hps\">nohow<\/span><span>, the state<\/span> <span class=\"hps\">attempted to<\/span> <span class=\"hps\">thwart<\/span> <span class=\"hps\">as many<\/span> <span class=\"hps\">investors<\/span> <span class=\"hps\">in renewable energy<\/span><span>.<\/span> <span class=\"hps\">First<\/span> <span class=\"hps\">payment<\/span> <span class=\"hps\">was<\/span> <span class=\"hps\">delayed<\/span> <span class=\"hps\">for half<\/span> <span class=\"hps\">subsidy<\/span> <span class=\"hps\">for renewable energy<\/span> <span class=\"hps\">through<\/span> <span class=\"hps\">green certificates<\/span> <span class=\"hps\">scheme<\/span><span>,<\/span> <span class=\"hps\">then<\/span> <span class=\"hps\">post<\/span> <span class=\"hps\">tax<\/span> <span class=\"hps\">income<\/span><span>.<\/span>\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">Czech<\/span> <span class=\"hps\">CEZ<\/span><span>,<\/span> <span class=\"hps\">GDF SUEZ<\/span> <span class=\"hps\">Enel<\/span> <span class=\"hps\">Italy and<\/span> <span class=\"hps\">France<\/span> <span class=\"hps\">are expected<\/span> <span class=\"hps\">to pay<\/span> <span class=\"hps\">annually<\/span> <span class=\"hps\">to 15<\/span> <span class=\"hps\">million<\/span> <span class=\"hps\">each for<\/span> <span class=\"hps\">special<\/span> <span class=\"hps\">construction<\/span> <span class=\"hps\">tax<\/span><span>.<\/span> <span class=\"hps\">Adrian<\/span> <span class=\"hps\">Borotea<\/span><span>,<\/span> <span class=\"hps\">corporate<\/span> <span class=\"hps\">business directory<\/span> <span class=\"hps\">of<\/span> <span class=\"hps\">manufacturers and distributors of<\/span> <span class=\"hps\">energy<\/span> <span class=\"hps\">CEZ<\/span> <span class=\"hps\">Romania<\/span><span>, said that<\/span> <span class=\"hps\">the annual fee<\/span> <span class=\"hps\">will amount<\/span> <span class=\"hps\">between 10 and 15<\/span> <span class=\"hps\">million per<\/span> <span class=\"hps\">year.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">Also, only<\/span> <span class=\"hps\">the first three<\/span> <span class=\"hps\">months of this<\/span> <span class=\"hps\">year,<\/span> <span class=\"hps\">was delayed<\/span> <span class=\"hps\">seaside<\/span> <span class=\"hps\">related grant<\/span> <span class=\"hps\">of<\/span> <span class=\"hps\">348 million<\/span> <span class=\"hps\">megawatts<\/span> <span class=\"hps\">produced<\/span> <span class=\"hps\">of six<\/span> <span class=\"hps\">major manufacturers<\/span> <span class=\"hps\">nationwide<\/span><span>,<\/span> <span class=\"hps\">Tomis<\/span> <span class=\"hps atn\">Team (<\/span><span>CEZ<\/span><span>)<\/span><span>,<\/span> <span class=\"hps\">Eolica<\/span> <span class=\"hps\">Dobrogea<\/span><span>,<\/span> <span class=\"hps\">Ovidiu<\/span> <span class=\"hps\">Development,<\/span> <span class=\"hps\">EDP<\/span> <span class=\"hps\">Renewables,<\/span> <span class=\"hps\">Cernavoda<\/span> <span class=\"hps\">Power<\/span> <span class=\"hps\">Wind<\/span><span>.<\/span> <span class=\"hps\">That means<\/span> <span class=\"hps\">348,000<\/span> <span class=\"hps\">green certificates<\/span><span>.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">If we refer to<\/span> <span class=\"hps\">similar production<\/span> for <span class=\"hps\">month<\/span> <span class=\"hps\">of March<\/span> <span class=\"hps\">so far<\/span><span>, that<\/span> <span class=\"hps\">from the beginning of<\/span> <span class=\"hps\">this year<\/span> <span class=\"hps\">until now<\/span><span>, the six<\/span> <span class=\"hps\">producers<\/span> <span class=\"hps\">totaled<\/span> <span class=\"hps\">at least<\/span> <span class=\"hps\">half a million<\/span> <span class=\"hps\">green certificates<\/span> <span class=\"hps\">deferred<\/span><span>, which means<\/span><span>,<\/span> <span class=\"hps\">in relation to<\/span> <span class=\"hps\">a maximum price<\/span> <span class=\"hps\">of 50<\/span> <span class=\"hps\">euros<\/span> <span class=\"hps\">certificate<\/span> <span class=\"hps\">now<\/span> <span class=\"hps\">grants<\/span> <span class=\"hps\">the<\/span> <span class=\"hps\">energy trading<\/span> <span class=\"hps\">market<\/span><span>,<\/span> <span class=\"hps\">no more and no<\/span> <span class=\"hps\">less than 25<\/span> <span class=\"hps\">million.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t<span class=\"hps\">Without<\/span> <span class=\"hps\">this<\/span> <span class=\"hps\">we count<\/span> <span class=\"hps\">the<\/span> <span class=\"hps\">records<\/span> <span class=\"hps\">Transelectrica<\/span> <span class=\"hps\">555<\/span> <span class=\"hps\">companies<\/span> <span class=\"hps\">that benefit from<\/span> <span class=\"hps\">the green certificates<\/span> <span class=\"hps\">support scheme<\/span><span>.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t<span class=\"hps\">NPS<\/span> <span class=\"hps\">overwhelmed<\/span><span>:<\/span> <span class=\"hps\">six times<\/span> <span class=\"hps\">more applications<\/span> <span class=\"hps\">than your<\/span> <span class=\"hps\">system<\/span>.\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">According to<\/span> <span class=\"hps\">a report from<\/span> <span class=\"hps\">Cambridge<\/span><span>, our country<\/span> <span class=\"hps\">has<\/span> <span class=\"hps\">an<\/span> <span class=\"hps\">absolute leading position<\/span> <span class=\"hps\">in Central<\/span> <span class=\"hps\">and Eastern Europe in<\/span> <span class=\"hps\">terms<\/span> <span class=\"hps\">of wind energy<\/span> <span class=\"hps\">production<\/span><span>.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">Almost<\/span> <span class=\"hps\">a quarter of all<\/span> <span class=\"hps\">wind<\/span> <span class=\"hps\">units<\/span> <span class=\"hps\">in the new member<\/span> <span class=\"hps\">states of the EU<\/span> <span class=\"hps\">are located<\/span> <span class=\"hps\">in Romania<\/span><span>, says the<\/span> <span class=\"hps\">document.<\/span> <span class=\"hps\">The avalanche of<\/span> <span class=\"hps\">wind projects<\/span> <span class=\"hps\">generated<\/span><span>, however,<\/span> <span class=\"hps\">serious problems<\/span> <span class=\"hps\">regarding<\/span> <span class=\"hps\">transportation<\/span><span>.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t<span class=\"hps\">According to the study<\/span><span>, the main<\/span> <span class=\"hps\">obstacle to<\/span> <span class=\"hps\">the construction of<\/span> <span class=\"hps\">new units<\/span> <span class=\"hps\">is<\/span> <span class=\"hps\">the limited capacity<\/span> <span class=\"hps\">of the national<\/span> <span class=\"hps\">electricity<\/span> <span class=\"hps\">transmission<\/span><span>.<\/span> <span class=\"hps\">In<\/span> <span class=\"hps\">the last three years<\/span><span>,<\/span> <span class=\"hps\">were issued<\/span> <span class=\"hps\">licenses<\/span> <span class=\"hps\">to connect to<\/span> <span class=\"hps\">the national network<\/span> <span class=\"hps\">of units<\/span> <span class=\"hps\">with a total capacity<\/span> <span class=\"hps\">of 17,000<\/span> <span class=\"hps\">megawatts<\/span><span>,<\/span> <span class=\"hps\">while the<\/span> <span class=\"hps\">NPS<\/span> <span class=\"hps\">may<\/span> <span class=\"hps\">incur<\/span> <span class=\"hps\">maximum<\/span> <span class=\"hps\">3,300<\/span> <span class=\"hps\">megawatts.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t<span class=\"hps\">State<\/span> <span class=\"hps\">puts<\/span> <span class=\"hps\">brakes<\/span> <span class=\"hps\">to wind<\/span> <span class=\"hps\">developers<\/span><span>.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"text-align: justify;\">\n\t&nbsp;\n<\/p>\n<p style=\"margin-left: 40px; text-align: center;\">\n\t<span lang=\"en\"><span span=\"\" title=\"\"><span lang=\"en\"><span span=\"\" title=\"\"><span class=\"microcontent\" data-description=\"when your employees feel that they can tangibly impact the direction of the company, they're more likely to throw themselves fully behind the cause.\" data-fragment=\"when-your-employees-feel\" data-micro=\"1\" span=\"\"><span for=\"\" required=\"\" span=\"\" title=\"\u00cen schimb, potrivit proiectului, articolul 17 se modific\u0103 astfel:\"><span span=\"\" title=\"plastic \u015fi sticl\u0103\"><span style=\"font-size:14px;\"><span style=\"font-family: tahoma,geneva,sans-serif;\"><a href=\"http:\/\/add-energy.ro\/en\/5-motive-pentru-care-puteti-deveni-partener-add-energy\/\" target=\"_blank\" rel=\"noopener\">5 reasons why you can become an Add-Energy Renewable Romania PARTNER<\/a><\/span><\/span> <\/span><\/span> <\/span> <\/span><\/span><\/span><\/span>\n<\/p>\n<p style=\"margin-left: 40px;\">\n\t<span lang=\"en\"><span span=\"\" title=\"\"><span lang=\"en\"><span span=\"\" title=\"\"><span class=\"microcontent\" data-description=\"when your employees feel that they can tangibly impact the direction of the company, they're more likely to throw themselves fully behind the cause.\" data-fragment=\"when-your-employees-feel\" data-micro=\"1\" span=\"\"><span for=\"\" required=\"\" span=\"\" title=\"\u00cen schimb, potrivit proiectului, articolul 17 se modific\u0103 astfel:\"><span span=\"\" title=\"plastic \u015fi sticl\u0103\"><span style=\"font-size:14px;\"><span style=\"font-family: tahoma,geneva,sans-serif;\">To register your Company as ADD ENERGY PARTNER , please access &nbsp; <a href=\"http:\/\/add-energy.ro\/wp-login.php?action=register\"><img loading=\"lazy\" decoding=\"async\" alt=\"register_now_2\" height=\"44\" src=\"http:\/\/add-energy.ro\/wp-content\/uploads\/2013\/05\/register_now_2.png\" width=\"94\" \/><\/a><\/span><\/span> <\/span><\/span> <\/span> <\/span><\/span><\/span><\/span>\n<\/p>\n<p style=\"margin-left: 40px;\">\n\t<span lang=\"en\"><span span=\"\" title=\"\"><span lang=\"en\"><span span=\"\" title=\"\"><span class=\"microcontent\" data-description=\"when your employees feel that they can tangibly impact the direction of the company, they're more likely to throw themselves fully behind the cause.\" data-fragment=\"when-your-employees-feel\" data-micro=\"1\" span=\"\"><span for=\"\" required=\"\" span=\"\" title=\"\u00cen schimb, potrivit proiectului, articolul 17 se modific\u0103 astfel:\"><span span=\"\" title=\"plastic \u015fi sticl\u0103\"><span style=\"font-size:14px;\"><span style=\"font-family: tahoma,geneva,sans-serif;\">For other informations click to <\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; &quot;It&#39;s very difficult to evacuate electrical power that wind turbines could produce. Should be massive investment in electricity transmission infrastructure, &quot;said Gabriel, PhD Negreanu, Bucharest Polytechnic University representative at the International Conference of Thermal Equipment, held on the coast. &nbsp; He explained that already is reached the maximum power that can be taken in &#8230; <a title=\"Paradise wind farm in Dobrogea \/ Romania, on the verge of collapse\" class=\"read-more\" href=\"https:\/\/add-energy.ro\/en\/paradise-wind-farm-in-dobrogea-romania-on-the-verge-of-collapse\/\" aria-label=\"Read more about Paradise wind farm in Dobrogea \/ Romania, on the verge of collapse\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[277,32,251,250,80,31],"tags":[],"class_list":["post-15008","post","type-post","status-publish","format-standard","hentry","category-answers-to-your-requests","category-informatii-din-presa-nationala","category-local-press-release","category-news","category-raspunsuri-la-solicitarile-dumneavoastra","category-stiri-utile-noutati"],"_links":{"self":[{"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/posts\/15008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/comments?post=15008"}],"version-history":[{"count":0,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/posts\/15008\/revisions"}],"wp:attachment":[{"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/media?parent=15008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/categories?post=15008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/add-energy.ro\/en\/wp-json\/wp\/v2\/tags?post=15008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}